Pertamina Geothermal Energy Tbk

Inner banner

Joint Operation Contract

Partnering to Success

We recognize that maintaining the development rate of green energy transition needs a strategic partnership with those with mutual ambition to provide clean and environmentally-friendly energy. Currently the Joint Operation Contract scheme run by PGE have 1,205 MW installed capacity.

No  Work Area  Management  Installed Capacity (MW) 
1 Gunung Salak Star Energy Geothermal Salak Ltd 377
2 Darajat Star Energy Geothermal Darajat II Ltd 271
3 Wayang Windu Star Energy Geothermal Wayang Windu Ltd 227
4 Sarulla Sarulla Operations Ltd 330
5 Bedugul Bali Bali Energy In development phase