Pertamina Geothermal Energy Tbk

Inner banner

PGE and MPI Conduct Joint Study for Geothermal Development

JAKARTA - As an opening for 2021, PT Pertamina Geothermal Energy (PGE) conducted a joint study with PT Medco Power Indonesia (MPI) in terms of geothermal development in the PGE and MPI Work Areas spread across Indonesia.

The collaboration kick of meeting was held on Friday (8/1) which was attended directly by the CEO of Subholding Power & New Renewable Energy (PNRE) Pertamina, Heru Setiawan along with PTH President Director of PGE, Tafif Azimudin and MPI President Director, Eka Satria and his staff PGE and MPI management.

At the Kick of Meeting, the CEO of Subholding PNRE, Heru Setiawan also said that solid collaboration is needed in geothermal development to support the Government of Indonesia in achieving the national renewable energy-based electricity target.

"This Kick Off Meeting is a follow-up to the mutual agreement signed by both parties with the aim of optimizing geothermal development in 7 regions or development of 700 MW," Heru said in his speech.

The geothermal development study will be carried out in the PGE and MPI Working areas over the next six months. The study is expected to accelerate geothermal development in the PGE and MPI working areas.

Heru added, the study will cover technical, legal, environmental and social, commercial (including funding) and risk aspects, which are expected to produce a business scheme that is competitive and has a positive impact on both parties by prioritizing compliance with compliance (Good Corporate Governance - GCG).

As one of the geothermal developers in Indonesia whose working area has contributed around 88% of the total installed geothermal capacity in Indonesia, PGE continues to commit to increasing New and Renewable Energy (EBT) in the national energy mix to 23% by 2025, especially from geothermal energy.

"This collaboration is a form of our commitment to geothermal development in Indonesia," added Heru.

Other News

Tuesday, 12 May 2026

PGE's Electricity Production Grows 15 Percent, Driving Positive Performance in the First Quarter of 2026

PGE recorded electricity production growth of 15.22 percent year-on-year (YoY) to 1,370 GWh.

Read More
Tuesday, 12 May 2026

PGE Records 40 Percent Increase in Net Profit in Q1 2026, Strengthening Geothermal Expansion

PGE recorded positive performance in the first quarter of 2026, reflecting solid business resilience.

Read More
Tuesday, 12 May 2026

From Energy to Food, PGE Partners with UGM's Faculty of Engineering and PT Agrotekno Estetika Laboratoris to Develop an Environmentally Friendly Geothermal-Based Agricultural Booster

PGE together with UGM and PT Agrotekno Estetika Laboratoris officially signed the JSDA for the Beyond-Katrili Project

Read More