| 1 |
November 2025 |
Procurement of Geothermal Wellhead Complete Set assembly at PT Pertamina Geothermal Energy Tbk (PGE) on a Call Off Order (COO) basis |
Download |
| 2 |
Oktober 2025 |
Engineering, Procurement, Construction and Commissioning (EPCC) Fluid Collection and Reinjection System (FCRS) Hululais Project Unit 1&2 (2x55 MW) |
Download |
| 3 |
Juni 2025 |
Procurement of rig services with a minimum capacity of 1500 HP along with its equipment for drilling and well repair workover (rate) in the Lahendong/Tompaso and Kotamobagu areas/projects of PT Pertamina Geothermal Energy Tbk (PGE) on a Call Off Order (COO) basis |
Download |
| 4 |
Juni 2025 |
Procurement of rig services with a minimum capacity of 750 HP along with its equipment for workover and well repair (course) in the Ulubelu, Karaha and Kamojang areas/projects of PT Pertamina Geothermal Energy Tbk (PGE) on a Call Off Order (COO) basis |
Download |
| 5 |
Juni 2025 |
Engineering, Procurement, Construction and Commissioning (EPCC) PLTP Lahendong Binary Unit (15 MW) |
Download |
| 6 |
Juni 2025 |
Engineering, Procurement, Construction and Commissioning (EPCC) PLTP Ulubelu Binary Unit (30 MW) |
Download |
| 7 |
March 2025 |
Procurement of Low Grade Casing Material for PT. Pertamina Geothermal Energy Tbk (PGE) Area/Project on Cal Off Order (COO) Basis |
Download |
| 8 |
March 2025 |
Procurement of High Grade Casing Material for PT. Pertamina Geothermal Energy Tbk (PGE) Area/Project on Call Off Order (COO) Basis |
Download |
| 9 |
January 2025 |
Procurement of Geothermal Wellhead Materials for PT Areas/Projects. Pertamina Geothermal Energy Tbk (PGE) With Call Off Order (COO) |
Download |
| 10 |
January 2025 |
Procurement of Rig services and equipment for drilling and rework and repair of wells (kurs) in areas/projects at PT Pertamina Geothermal Energy Tbk on a Call Off Order (COO) basis |
Download |
| 11 |
December 2024 |
Procurement of 30 Inch Pipe Stove |
Download |
| 12 |
July 2024 |
Reinjection System Revitalization Services for Units 1-4 PGE Lahendong Area |
Download |
| 13 |
June 2024 |
Procurement of Spatial Design Consultation Services for office and Dormitory PT. PGE Lumut Balai Area |
Download |
| 14 |
March 2024 |
Procurement of Long Term Contract Technical Services for overhaul, inspection, testing, minor inspection, TA and workshop support work in all PGE areas for the period 2024-2028 |
Download |
| 15 |
September 2023 |
Announcement of Auction for the Procurement of Hot Packer Services and Equipment for Wellhead Coding Work in the Area/Project of PT Pertamina Geothermal Energy Tbk on a Call Off Order (COO) Basis |
Download |
| 16 |
August 2023 |
Announcement of Auction for the Procurement of Hot Packer Services and Equipment for Wellhead Coding Work in the Area/Project of PT Pertamina Geothermal Energy Tbk on a Call Off Order (COO) Basis |
Download |
| 17 |
May 2023 |
Announcement of Sales Auction Packages of Used Office Inventory in the form of Office Furniture and Equipment |
Download |
| 18 |
February 2023 |
Announcement of Auction for Procurement of Material Casing Accessories Premium Connection for Drilling in PT PGE Areas/Projects |
Download |
| 19 |
April 2022 |
Announcement of Tender for Procurement of Water Pump Services and Equipment for Drilling and Exchange Rates in the PT PGE Project Area on a COO Basis |
Download |
| 20 |
January 2022 |
Announcement of Auction for Drilling Casing Procurement on a Call Off Order Basis for PT PGE Areas and Projects |
Download |