Pertamina Geothermal Energy Tbk

Inner banner

Sibayak

The Sibayak area is located in the WKP Gunung Sibayak-Gunung Sinabung, North Sumatra Province, where there is 1 monoblock unit with an installed capacity of 2 MW and 2 PLTP units with a capacity of 2x5 MW. This small-scale PLTP is part of a national priority program to increase TKDN. The total installed capacity at this time is 12 MW.

12 MW

Installed Capacity

3 UNIT

Geothermal Power Plants

Gunung Sibayak & Gunung Sinabung

Geothermal Work Area (WKP)

62.400 tCO2/year

Emission reduction potential

13.300 Rumah

Electricity supply estimation

568 BOEPD

Potential savings of oil reserves

figure